Improving Our Community

Venture Out Projects

Stay informed about projects underway, upcoming improvements, and recently completed work throughout Venture Out.

Summer 2026 Approved Projects

13 Projects
Active

Acetylene Lines

The acetylene lines in the Silversmith Room were more than 20 years old and presented a potential safety concern. The aging lines were replaced to support a safer environment for residents using the facility.

Start Date
08/11/2026
End Date
In Progress
Estimated Cost
$3,000
Completed

East Pool Filter

The East Pool’s aging filter developed a crack that allowed sand to enter the pool. The damaged filter was replaced to improve water filtration and help maintain a cleaner, more enjoyable swimming environment.

Start Date
08/15/2026
End Date
08/18/2026
Estimated Cost
$8,000
Active

EPC Landscaping

After more than 20 years, the landscaping in the EPC area is ready for an update. Improvements are planned to refresh the space and enhance the overall appearance of the community.

Start Date
08/25/2026
End Date
In Progress
Estimated Cost
$40,000
Completed

Higley Road Landscaping

The landscaping along Higley Road had several dead plants and areas with little or no decorative rock. Improvements were completed to create a cleaner, more attractive appearance that reflects the pride we take in the Venture Out community.

Start Date
06/29/2026
End Date
07/01/2026
Estimated Cost
$14,000
Completed

Lawn Bowling Turf Replacement

The lawn bowling turf had deteriorated due to improper maintenance practices. With a new specialized mower and enhanced staff training, we are working to restore the playing surface and make it one of the best lawn bowling facilities in the area.

Start Date
06/09/2026
End Date
06/16/2026
Estimated Cost
$25,000
Active

Manhole Project

After 54 years of service, the community’s sewer manholes have begun to deteriorate. This project will restore them to like-new condition and includes a 30-year warranty, helping protect this essential infrastructure for years to come.

Start Date
06/09/2026
End Date
In Progress
Estimated Cost
$400,000
Pending

New Sewer Line from Kitchen to Road

A new sewer line is planned from the kitchen’s grease pit to the street. Currently, the grease pit must be emptied manually, and this improvement will provide a more efficient, reliable long-term solution.

Start Date
To Be Determined
End Date
To Be Determined
Estimated Cost
$8,000
Completed

Rec Center Drain by Mailroom

Rainwater near the Recreation Center mailroom was draining toward the building, creating the potential for water damage. The area was regraded and a larger drainage pit was installed to direct water away from the facility.

Start Date
07/14/2026
End Date
07/18/2026
Estimated Cost
$6,100
Pending

Rec Center Foam Roof

This project will replace the final remaining section of the Recreation Center’s foam roof that has not yet been updated, completing the facility’s roof improvements.

Start Date
09/02/2026
End Date
To Be Determined
Estimated Cost
$25,000
Completed

Seal Coating Streets

Venture Out’s streets were seal coated with Holbrook Asphalt’s HA5 product. This high-performance treatment is expected to last seven to nine years, approximately twice as long as conventional sealers, helping protect our streets and extend their service life.

Start Date
06/01/2026
End Date
08/21/2026
Estimated Cost
$205,000
Completed

Silversmith A/C Unit

The Silversmith Room previously relied on an evaporative cooler and did not have a heating system. A new mini-split system was installed to provide residents with more comfortable temperatures.

Start Date
08/14/2026
End Date
08/15/2026
Estimated Cost
$10,160
Completed

Turf Mower for Sports Courts

A professional greens mower was purchased to properly maintain three of the community’s sports courts, each of which requires the same specialized care as a putting green. This equipment will help ensure the playing surfaces receive the consistent, appropriate maintenance they need.

Start Date
06/09/2026
End Date
06/09/2026
Estimated Cost
$20,000
Completed

Valley Gutters

Many of the community’s concrete valley gutters had become cracked or damaged over time. The affected sections were replaced to improve drainage and maintain the condition of our roadways.

Start Date
07/01/2026
End Date
07/14/2026
Estimated Cost
$40,000

Upcoming Summer 2027 Projects

19 Projects
  • Administration Carport
  • Aztec Road Remodel
  • Begin Sewer Line Project
  • Club Flooring
  • East Pool Acid Wash
  • East Pool Liquid Feed System
  • East Pool Tile
  • Finish Manholes
  • Front Office Glass Doors
  • Higley Wall Replacement
  • IT Equipment
  • Landscape Replacement
  • New A/C Units
  • Pickleball Court Resurfacing
  • Replace Conference Room Doors
  • RV Storage Lot Asphalt
  • Street Crack Filling
  • Tennis Court Resurfacing
  • Tree Replacement